Skip to main content
22 Years GTA Custom Fabrication
(437) 524-2993
North York Glass Railings August 2025

Lawrence Park Frameless 15mm Glass Railing Over Two Floors

Frameless 15mm laminated glass guard with a brushed 316 stainless top rail runs the main stair and upper landing in a Lawrence Park family home. Base-shoe mounted, no visible standoffs, OBC 9.8 compliant on the first inspection.

Price

$18,500

Timeline

3 weeks (2 shop, 1 week install)

Client

Residential, renovation

Base shoe laminated glass guard along the open landing before top rail installation
In fabrication
Frameless 15mm laminated glass railing with brushed 316 stainless top rail along a Lawrence Park landing
Final install

The scope

A Lawrence Park homeowner wanted the main stair and the upper landing opened up with frameless glass so the two-storey entry read as one volume. We quoted 15mm laminated safety glass (6-1.52-6) in a base-shoe aluminum channel finished in satin anodized bronze, with a continuous brushed 316 stainless top rail. Total run was 32 linear feet across the stair run, two landings, and the loft overlook.

The timeline

Two weeks for shop fabrication of the base shoe, dry fit of the top rail on the client’s existing newel, and the glass order through our Mississauga supplier. One week on site to anchor the base shoe into the plywood sub-floor with structural lag bolts, set and shim each glass panel with the gasket system, and run the stainless top rail with hidden brackets.

The outcome

The guard meets OBC Section 9.8 for guard height (1070mm) and the 0.75 kN concentrated load requirement, and the Toronto inspector cleared the installation on the first visit. The homeowner reports the view from the loft down to the entry foyer is now completely unobstructed.

Thinking About a Project Like This?

Shop drawings and a written CAD quote within 5 business days. 22 years of GTA custom fabrication, OBC Section 9.8 and 3.4 compliance.

Call Now Get Free CAD Quote